Company Procedures

SWMS 005 – Working in Switchboards SWMS 006 – Removal of Metering EquipmentSWMS 007 – Replacement of Service Fuse(s) SWMS 008 – Installation and Connection of Overhead Service Mains SWMS 009 – Installation of Underground Services SWMS 010 – Conduit Installation Prior to Pouring Concrete SWMS 011 – Conduit Installation in the Ground SWMS 012 – Conduit Installation in Walls and Ceilings SWMS 013 – Cable and Ladder Tray Installation SWMS 014 – Working in Risers SWMS 015 – Using Portable Ladders SWMS 016 – Install Light Fittings SWMS 017 – Installation of Switchboards SWMS 018 – Installation of Pyrotenax (MIMS) Cable SWMS 019 – Installation of Lighting Looms SWMS 020 – Installation of Cable Supports SWMS 021 – Installation of Mains SWMS 022 – Installation of Switchboard Connections SWMS 023 – Installation of New Work in Existing Switchboards SWMS 024 – Installation of Sub Mains SWMS 025 – Installation of Power Light and Cabling SWMS 026 – Installation of Power Points SWMS 027 – Working with Elevated Work Platforms SWMS 028 – Using Mobile Scaffolds SWMS 029 – Cutting and Drilling Synthetic Mineral Fibres (SMF) SWMS 030 – Unloading Trucks On Site SWMS 031 – Substation Connection SWMS 032 – Installation of Electrical Equipment SWMS 033 – Disconnect and Remove Electrical Equipment SWMS 034 – Working with Excavator SWMS 035 – Identification of Asbestos SWMS 036 – Trench Excavate SWMS 037 – Removal of Asbestos SWMS 038 – Installation of Antenna SWMS ACKNOWLEDGEMENT REGISTER